*AIRFRAME MODIFICATIONS*
DATE: 8/1/2003 MODIFICATION: Repaired upper left wing components using Poly-Fiber Process. Installed King KT76A Transponder.
DATE: 2/26/2001 MODIFICATION: Wood repairs to LH and RH upper wings. Wood repairs to LH and RH lower wings. Replaced all wood stringers, bulkheads, formers, gussets, blocks, headliner supports, and floorboards. Installed Alcor EGT gauge and probe, PS Engineering Intercom PM1000, Weldon fuel pump.
DATE: 4/26/1996 MODIFICATION: Installed Century Flight System 2000 Autopilot
DATE: 5/12/1983 MODIFICATION: Install Davtron M-202 Intercom
DATE: 1/3/1970 MODIFICATION: Recovered fuselage with Ceconite 101
DATE: 10/31/1967 MODIFICATION: Install King KX100 power supply
DATE: 12/3/1946 MODIFICATION: Original Airworthiness Certificate