Engines
- Engine 1 Time:
- Engine Summary – P33050 (Right)
- Engine Overhauled Carried Out by Allied Signal
- 22 Mar 1995
- Time Since New – 5303.4
- Hot Section Inspection Carried Out by Priority Turbines
- 30 May 2002
- Engine TSO – 1727.5
- Engine has had regular service and maintenance carried out and the ngine logbooks has entries to reflect the works.
- 26 June 2003 – 1 Feb 2018
- Aircraft Hobbs – 2370.9 (Current)
- Engine TSO – 3082
- Engine TSH – 1354.7
- Engine Summary – P06846
- Engine P06846 Installed on aircraft and details below
- 9 Feb 1999
- Engine TSO – 3103.5
- Engine CSO – 3243 (cycles)
- Hot Section Inspection Carried out by Intercontinental Jet
- 7 April 1999
- Engine TSO – 3124.9
- Engine CSO – 3311 (cycles)
- Engine has had regular service and maintenance carried out and the Engine logbooks has entries to reflect the works.
- 9 Aug 1999 – 1 Feb 2018
- Aircraft Hobbs – 2370.9 (Current)
- Engine TSO – 4885.2
- Engine TSH – 1760.3
Props
- Hartzell 4 Blade HC-B4TN-5GL
- Right Hand Prop: TSO-78.7 Hours SOH (1 Feb 2018)
- Left Hand Prop: TSO- 78.7 Hours SOH (1 Feb 2018)