- 1C/5C Accomplished in July 2022, 2C Not Due Until July 2028
- Landing Gear Overhaul Not Due Until March 2028
- Dual UNS-1Fw GPS/FMS WAAS/LPV
- Good Cosmetics
- MSP Gold
Please contact Gary Ernst for more information.
For Sale
Please contact Gary Ernst for more information.
Fort Lauderdale, Florida, United States
United States
8,861 hours
TTAF: 8861
Landings: 5680
Honeywell AFIS DMU
Dual Davtron M811B Clocks
Teledyne Angle of Attack Indication System
Collins Airshow 400
RVSM SB F50-246 Compliant
Concorde RG390E/LS Lead Acid Main Batteries
CAMP Maintenance Tracking Enrolled
Aircell ST3100 Radio/Satellite Telephone
Honeywell N1 DEECs
Wing Fuel Tank Dry Bay Mod AD & SB C/W 3/7/16
8,529 hours SNEW
8,705 hours SNEW
8,687 hours SNEW
TFE731-3-1C on MSP Gold
Engine 1: 8529.9 HSN, 5647 CSN, 482.2 Hrs Until MPI, 2007.5 Hrs Until CZI
Engine 2: 8705.6 HSN, 5555 CSN, 788.0 Hrs Until MPI, 3688.0 Hrs Until CZI
Engine 3: 8687.9 HSN, 5559 CSN, 673.8 Hrs Until MPI, 2378.8 Hrs Until CZI
APU: GTCP36-100(A)
5040 HSN, 1368.1 Hrs Until HSI
Instrument Flight Rules
Dual UNS-1Fw GPS/FMS (1000.8)
Collins Dual VHF-22C w/ 8.33 Spacing
Collins WXT-250A Weather Radar
Collins Dual VIR-32 Navs w/ FM Immunity
Collins TTR-920 TCAS II (MOPS 7.0)
Collins Dual ADF-60A
Honeywell Mark V EGPWS
Collins Dual DME-42
Collins EFD-86 Five Screen EFIS
Collins Dual RTUs
Collins Dual ALT-55B Radio Altimeter
Fairchild A100A CVR
Honeywell Triple Laseref II IRS
Bendix King Dual KTR-953 HF Radios
Collins FCC-86D Flight Control System
Artex ELT C406-1 406MHz
Collins Dual TDR-94D Enhanced Mode S Transponders with ADS-B Out
11
Refurbished December 8, 2006
9 Passenger Cabin Configuration & Jumpseat
Aft Lavatory and Fwd Galley
Tia WaveJet Microwave & Hot Liquid Container
110V Cabin Outlets
DVD/CD/AUX Cabin Entertainment w/ Fwd Cabin Monitor
Cabin LED Lighting
2006
White with Orange & Gray Stripes, Painted 03/07/2016
LED Taxi, Landing, Nav & Rear Strobe
2016
1B due in 1450 hrs
12M due July 2024
2B & 4B due in 1597 hrs
24M due May/June 2022
3B due in 3097 hrs
36M due July 2025
1C/5C accomplished in July 2022, 2C due July 2028
MLG, NLG & Drag Brace Overhaul due MAR 2028