- Keith Freon Air Conditioning
- Thrust Reversers
- Upgraded Avionics Garmin 750/530
- B&D Cabin Info Display
- Gill Lead Acid Battery
- Sierra Quick Release Nose Radome
- Recognition Lights
- Precise Flight Pulse Lights
- Quick Donning O2 Masks
- Belted, Flushing Enclosed Lav
- Enrolled on Bacon Low-Utilization Maintenance Program
Loading photos
1985 Cessna S550 Citation S/II
Used
Call for price
08/22/2024
Registration no. N550SGSerial no. S550-0070
101 VIEWS
106 DAYS ON FLYING
0 SAVES
Aircraft Listing Type
For Sale
Highlights
Seller location
Austin, Texas, United States
Aircraft location
Austin, Texas, United States
Airframe & Propulsion
Airframe Total time
8,838 hours
Airframe Description
- Total Time Since New 8,837.9 Hours (6/1/2023)
- Cycles Since New 5,989 Landings
Engine 1 hours
8,460 hours SNEW
Engine 2 hours
8,774 hours SNEW
Propulsion
Engines
- Pratt & Whitney JT15D-4
- 3,500 Hour TBO
- Eng #1 S/N PCE-102083
- Total Cycles Since New 5,627 Cycles
- Time Since Overhaul 2,632.0 Hours
- Time Since Hot Section 905.0 Hours
- Eng #2 S/N PCE-102096
- Total Cycles Since New 5,865 Cycles
- Time Since Overhaul 1,709.0 Hours
- Time Since Hot Section 13.0 Hours
Avionics
Flight rules
Instrument Flight Rules
Navigation equipment
- Avionics Package: Honeywell FZ-500 IFCS/Pro Line II
- AP/FD: Honeywell SPZ-500 IFCS Single Cue
- Multifunction Display: Garmin 750
- GPS/Nav/Comm: Garmin 530
- CVR: Fairchild GA100
- DME: Dual Collins DME-42
- ELT: Artex 406-1
- Air Data: IS&S Air Data System with RVSM
- Stormscope: BFGoodrich WX-12
- TCAS I: BFGoodrich TCAS-791
- Transponder: Dual Collins TDR-90
- Weather Radar: Primus 300SL color
Interior & Exterior
Number of seats
8
Exterior Condition
- Overall Matterhorn White with Black, Yellow, and Platinum stripes in custom paint scheme.
Maintenance
Inspection Status
Inspection C/W Due
- Phase 12 Mo 10/2022 10/2023
- Phase 24 Mo 10/2022 10/2024
- Phase 36 Mo 5/2023 5/2026
- Phase 48 Mo 9/2020 9/2024
- Phase 60 Mo 4/2020 4/2025
- Phase 72 Mo 3/2023 3/2029
- Phase 96 Mo 2/2022 2/2030
- Phase 144 Mo 10/2019 10/2031
- #1 Overhaul 6,206 Hr 9,706 Hr
- #1 Hot Section 7,933 Hr 9,733 Hr
- #2 Overhaul 7,129 Hr 10,629 Hr
- #2 Hot Section 8,825 Hr 10,625 Hr
Supporting Materials
Citation-SII-S550-0070-230412_compressed.pdf
Price Change history
Date
Event
Price
08/22/2024
Listed for Sale
Listed without a price