Sold as a Package Deal with S/N 550-0486 for Spares
Sorry, this listing is no longer available.
1980 Cessna 550 Citation II
Aircraft Listing Type
For Sale
Highlights
Seller location
Sarasota, Florida, United States
Aircraft location
Santiago, Santiago Metropolitan Region, Chile
Airframe & Propulsion
Airframe Total time
14,457 hours
Airframe Description
TTAG: 14457.8
Landings: 9472
Engine 1 hours
7,247 hours SNEW
Engine 2 hours
8,778 hours SNEW
Propulsion
JT15D-4
Left Engine: PCE70910
7247.7 HSN, 5832 CSN, 3187.3 Hours Remaining Until OH
Right Engine: PCE70174
8778.5 HSN, 7062 CSN, 1252.7 Hours Remaining Until OH
Avionics
Flight rules
Instrument Flight Rules
Navigation equipment
ADF: Dual Collins ADF-60A
Altimeter: Dual (1 encoding)
Autopilot: Sperry SPZ-500 IFCS
Communication Radios: Dual Collins VHF-20
Compass: Dual Sperry C-14D
CVR: Fairchild A100A
DME: Dual Collins DME-42
Flight Director: Sperry MS-205
Flight Rules: IFR
FMS: Universal UNS-1K w/GPS
GPS: No
Navigation Radios: Dual Collins VIR-30
Radar Altimeter: Sperry AA-215
RMI: Dual Collins
TAWS: No
Transponder: Dual Collins TDR-90
Weather Radar: Honeywell RT-131A
Cockpit: ELT, angle of attack indicator
Equipment: Thrust reversers, anti-skid brakes, Branson gross weight increase mod, aft baggage mod, zero fuel weight increase mod
Interior & Exterior
Number of seats
6
Interior Condition
Air Conditioning: No
General: Bravo-style interior
Seating: Bravo-style grey leather double club seating w/taupe inserts & matching arm rests
Headliner: Sahara Sands beige headliner
Sidewalls: Sahara Sands beige upper sidepanels, almond lower sidepanels
Carpet: Almond carpeting
Refreshment: Forward Slimline refreshment center, mid-cabin Pyramid cabinet
Cabinetry/Wood: Hide-away executive work tables
Lavatory: Belted aft lav
Exterior Condition
High-gloss Matterhorn white w/green & black stripes
Maintenance
Inspection Status
Maintained: FAR Part 135
Airframe Maint Program: Cessna MM ATA 04 & 05
Phase 10 Inspection c/w 14457,8 DUE May 2025
Phase B Inspection c/w 14442,4 DUE 14592,4
Phase 57 Inspection c/w On condition DUE N/A
Phase 11 Inspection c/w SB550-22-06 DUE N/A
Phase 58 Inspection c/w N/A not installed DUE N/A
Phase 61 Inspection c/w 12 DEC 23 DUE 11 JUN 24
Phase 1 Inspection c/w 14442,4 – 05 MAR 23 DUE 14472,4 – 04 MAR 25
Phase 2 Inspection c/w 14442,4 – 05 MAR 23 DUE 14472,4 – 04 MAR 25
Phase 3 Inspection c/w 14442,4 – 05 MAR 23 DUE 14472,4 – 04 MAR 25
Phase 4 Inspection c/w 14442,4 – 05 MAR 23 DUE 14472,4 – 04 MAR 25
Phase 18 Inspection c/w MAY 24 DUE MAY 25
Phase 34 Inspection c/w MAY 24 DUE NOV 25